Baxi Duo-tec 2 Combi 24 GA Guide d'installation Page 22

  • Télécharger
  • Ajouter à mon manuel
  • Imprimer
  • Page
    / 56
  • Table des matières
  • MARQUE LIVRES
  • Noté. / 5. Basé sur avis des utilisateurs
Vue de la page 21
22
9.0 Installation
© Baxi Heating UK Ltd 2007
9.1 Unpacking & Initial Preparation
IMPORTANT
RISK ASSESSMENT - Before commencing the installation
it is recommended that the ‘Five Steps to Risk
Assessment’ document published by the HSE is
consulted, and an assessment performed as described.
GAS SUPPLY - The gas supply, gas type and pressure
must be checked for suitability before connection (see
Section 7.4).
NOTE: A small amount of water may drain from the boiler
in the upright position. If pre-plumbing it will be necessary
to turn the carton over to access the wall plate first.
1. Remove staples, open flaps and remove the cardboard
sheet. Remove the polystyrene side pieces and literature. Two
people can then lift out the boiler (Fig. 17).
2. After considering the site requirements
(see Section 7.0) position the fixing template on the wall
ensuring it is level both horizontally and vertically.
3. Mark the position of the two most suitable fixing slots for
the wall plate and boiler lower fixing holes.
4. Mark the position of the centre of the flue hole (rear exit).
For side flue exit, mark as shown (Fig. 18).
5. If required, mark the position of the gas and water pipes.
Remove the template.
6. Cut the hole for the flue (minimum diameter 116mm).
7. Drill the wall as previously marked to accept the wall plugs
supplied. Secure the wall plate using the fixing screws.
8. Using a spirit level ensure that the plate is level before finally
tightening the screws.
9. Connect the gas and water pipes to the valves on the wall
plate using the copper tails supplied. Ensure that the sealing
washers are fitted between the connections.
NOTE: 40kW models ONLY - ensure the flow restrictor is
inserted in cold water inlet connection (Fig. 19). On other
models the restrictor is factory fitted internally.
10. Fit the filling loop as described in the instructions supplied
with it.
9.2 Flushing
1. Connect a tube to the heating flow or return pipe (Fig. 20).
2. Flush thoroughly (see System Details, Section 6.2).
Fig. 20
150mm
For Side Flue Exit
Heating Return
Flushing Tube
Fig. 18
Fig. 17
Heating Flow
3/4” BSP
Connections
Fig. 19
200 mm
Recommended
Pressure
Relief
Valve
(15mm)
Condensate
Drain
Part No. 720636602
65 mm 65 mm 65 mm 65 mm
5 mm Minimum
Side Clearance
5 mm Minimum
Side Clearance
Boiler Mounting Bracket
Fixing Slots
116mm Dia Minimum
Aperture For Flue Tube
Side Flue
Centre Line
Vertical Flue
Centre Line
175 mm
Minimum
Clearance
Profile of
Outercase
Ø 8 mm
Ø 8 mm
177 mm
45 mm
50 mm
50 mm
30
95 mm
Part No. 720636602
Hot Water
Outlet
(15mm)
Cold Water
Inlet
(15mm)
Heating
Return
(22mm)
Heating
Flow
(22mm)
Gas
Inlet
(22mm)
150 mm
Minimum
Clearance
Flow Restrictor
(40 kW model only)
Wall Template
Vue de la page 21
1 2 ... 17 18 19 20 21 22 23 24 25 26 27 ... 55 56

Commentaires sur ces manuels

Pas de commentaire