10.0 Commissioning
© Baxi Heating UK Ltd 2012
Fig. 40
Fig. 41
Inlet Gas Pressure Test Point
DO NOT check gas pressure here
1. It may be necessary to adjust the boiler gas type if the supply is changed, for example
when Natural Gas is provided to a rural area previously reliant on Propane. In these
instances a replacement Gas Type Label may be required, which is available on request
as a spare part.
2. Press & and hold for at least 6 seconds. will be displayed,
alternating with .
3. Press to select the next parameter . Press .
4. Press or to select the value that corresponds with the required
gas type. For Natural Gas:-
For Propane:-
5. Press to save the change, then to return to the normal display.
Changing the Gas Type
10.2 Check the Operational (Working) Gas Inlet
Pressure & Gas Rate
Note: The system MUST be cold to ensure the boiler is
operating under full demand. To obtain an accurate
measurement on smaller capacity systems it may be
necessary to open one or more hot taps in order to
maintain the boiler at full rate.
1. Press & together and hold for at least 6
seconds.
On will be displayed briefly, followed by 304
then 100when the boiler is lit, indicating the CH output is
at MAXIMUM (‘Chimney Sweep Function’).
2. With the boiler operating in the maximum rate condition
check that the operational (working) gas pressure at the inlet
gas pressure test point is in accordance with B.S. 6798 & B.S.
6891. This must be AT LEAST 17mb ! (LPG - 37mb)
3. Ensure that this inlet pressure can be obtained with all other
gas appliances in the property working.
Measure the Gas Rate
4. With any other appliances & pilot lights turned OFF the gas
rate can be measured. It should be:-
Natural Gas 24 model 2.54 m
3
/h
28 model 2.96 m
3
/h
33 model 3.49 m
3
/h
40 model
4.23 m
3
/h
Propane 24 model 1.92 kg/h
28 model 2.25 kg/h
33 model 2.64 kg/h
40 model 3.2 kg/h
5. Press & together and hold for at least 6
seconds to exit the function.
6. Carefully read and complete all sections of the Benchmark
Commissioning Checklist at the rear of this publication that are
relevant to the boiler and installation. These details will be
required in the event of any warranty work. The publication
must be handed to the user for safe keeping and each
subsequent regular service visit recorded.
7. For IE, it is necessary to complete a “Declaration of
Conformity” to indicate compliance with I.S. 813. An example
of this is given in I.S. 813 “Domestic Gas Installations”. This is in
addition to the Benchmark Commissioning Checklist.
R
N.G. Factory
Set
When reset for
L.P.G.
Gas Type Label
Vue de la page 0
1 2 3 4 5 6 ... 27 28

Résumé du contenu

Page 1 - 10.0 Commissioning

2910.0 Commissioning© Baxi Heating UK Ltd 2012Fig. 40Fig. 41Inlet Gas Pressure Test PointDO NOT check gas pressure here1. It may be necessary to adjus

Page 2 - To change the information

3813.0 Changing Components© Baxi Heating UK Ltd 201213.14 Hall Effect Sensor (Fig. 59)1. Ease the sensor upwards off the hydraulic inletmanifold assem

Page 3 - 12.0 Servicing

3913.0 Changing Components© Baxi Heating UK Ltd 2012Plate HeatExchangerRubber Seal13.17 Plate Heat Exchanger (Fig. 62)1. Close the flow & return i

Page 4

4013.0 Changing Components© Baxi Heating UK Ltd 201213.19 P.C.B. & R.D.S. (Removable Data Stick) (Fig. 64)NOTE: Both P.C.B. and R.D.S. are availab

Page 5

4113.0 Changing Components© Baxi Heating UK Ltd 201213.20 Gas Valve (Fig. 65)IMPORTANT: After replacing the valve the CO2must becalibrated as detailed

Page 6

42© Baxi Heating UK Ltd 2012Fig. 67PlugAnalyser Probe14.0 Combustion & Calibration14.1 Checking the Combustion1. Combustion should be:-Natural Gas

Page 7

4315.0 Electrical© Baxi Heating UK Ltd 201215.1 Illustrated Wiring DiagramX23 X37 X36X22 X20 X24X10X11X12X13X1X2Flue SensorHeatingReturnSensorHeatingF

Page 8

4416.0 Short Parts List© Baxi Heating UK Ltd 2012Short Parts ListKey Description ManufacturersNo. No. Part No.A Fan 720768101B Burner (24/28/33) 72076

Page 9

‘Service Due’ Message1. After 11 months operation the ‘Service Due’ message willbe shown on the boiler display. (If the installation has beensubject t

Page 10 - 13.0 Changing Components

4617.0 Fault Finding© Baxi Heating UK Ltd 2012Refer to “Illustrated Wiring Diagram” for position of terminals and componentsCentral Heating - Follow o

Page 11

4717.0 Fault Finding© Baxi Heating UK Ltd 2012Domestic Hot Water - Follow operational sequenceTurn on mains power The display illuminates20, 28

Page 12

30© Baxi Heating UK Ltd 2012Fig. 42Facia PanelCase Front Panel11.0 Completion & System Draining11.1 Completion1. Replace the case front panel, and

Page 13

4817.0 Fault Finding© Baxi Heating UK Ltd 2012Fault Finding Solutions SectionsIs there 230V at:Main terminals L and N Check electrical supply1.NOMain

Page 14 - 14.3 Adjusting the CO

4917.0 Fault Finding© Baxi Heating UK Ltd 2012Replace PCBCheck and correct if necessary1. Ignition electrode and lead2. Electrode connection3. Spark g

Page 15 - © Baxi Heating UK Ltd 2012

5017.0 Fault Finding© Baxi Heating UK Ltd 2012IMTemperature sensors faulty.Cold resistance approximately10kë @ 25° C (CH sensor)20kë @ 25° C (Flue s

Page 16 - 16.0 Short Parts List

51© Baxi Heating UK Ltd 201218.0 External Low Voltage Controls18.1 Positioning the Optional Outdoor Sensor1. The Sensor must be fixed to an external w

Page 17 - 17.2 Error Codes

5218.0 External Low Voltage Controls© Baxi Heating UK Ltd 201218.4 Connecting the Optional 7 Day Wired SensorNOTE: The yellow link wire between termi

Page 18 - 17.0 Fault Finding

53© Baxi Heating UK Ltd 2012Optional 7 Day Wireless Sensor & 24hr Wireless Sensor18.0 External Low Voltage Controls18.5 Connecting the Optional 7

Page 19

GAS BOILER SYSTEM COMMISSIONING CHECKLISTThis Commissioning Checklist is to be completed in full by the competent person who commissioned the boiler a

Page 20

Service RecordIt is recommended that your heating system is serviced regularly and that the appropriate Service Interval Record is completed.Service P

Page 21

© Baxi Heating UK Ltd 2012Comp No. 7206334 - 07 (9/12)BAXI A Trading Division of Baxi Heating UK Ltd (3879156)Brooks House, Coventry Road, Warwick. CV

Page 22

3112.0 Servicing© Baxi Heating UK Ltd 201212 .1 Performance Safety Check & Annual Servicing1. For reasons of safety and economy, it is recommended

Page 23 - 2.5m Min

3212.0 Servicing© Baxi Heating UK Ltd 201212.2 Annual Servicing Inspection (Cont)5. Remove the clip securing the gas feed pipe to the air/gasventuri.

Page 24 - Optional 7 Day Wired Sensor

3313.0 Changing Components© Baxi Heating UK Ltd 2012IMPORTANT: When changing components ensure thatboth the gas and electrical supplies to the boiler

Page 25 - 2. Ease Backplate away

3413.0 Changing Components© Baxi Heating UK Ltd 201213.2 Fan (Fig. 50)1. Remove the clip securing the gas feed pipe to the air/gasventuri. Disconnect

Page 26

3513.0 Changing Components© Baxi Heating UK Ltd 201213.4 Burner (Fig. 52) 1. Remove the clip securing the gas feed pipe to the air/gasventuri and disc

Page 27 - Service Record

3613.0 Changing Components© Baxi Heating UK Ltd 201213.6 Flue Sensor (Fig. 54)1. Ease the retaining tab on the sensor away and disconnectthe electrica

Page 28 - Website www.baxi.co.uk

3713.0 Changing Components© Baxi Heating UK Ltd 2012Socket HeadedScrewPump HeadPump BodyAutomatic AirVentFig. 57Fig. 58Electrical SupplyPlugPump FlowP